The gentleman farmer recorded the time it took to feed and water his chickens and collect eggs each morning. He has done this several times, so he assigns himself a rating of 1.25. The allowance factor for this endeavor is 5%. What is the standard time for this job element?
A) greater than or equal to 8.5 minutes
B) less than 8.5 minutes but greater than or equal to 8.0 minutes
C) less than 8.0 minutes but greater than or equal to 7.5 minutes
D) less than 7.5 minutes
Correct Answer:
Verified
Q21: Garman observes a worker assembling peanut valves
Q22: During a time study, the following times
Q23: A time study analyst is determining the
Q24: The gentleman farmer recorded the time it
Q25: When using a time study approach, the
Q27: Keith assembles peanut valves and the recorded
Q28: To set a time standard for a
Q29: An industrial engineer is conducting a time
Q30: A worker was observed for four cycles
Q31: A time study analyst is attempting to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents