
The first unit of production takes 12 hours to produce and the learning rate is expected to be 80 percent. How long will it take to produce the fourth unit?
A) less than or equal to 7.0 hours
B) greater than 7.0 hours but less than or equal to 7.5 hours
C) greater than 7.5 but less than or equal to 8.0 hours
D) greater than 8.0 hours
Correct Answer:
Verified
Q156: Which of the following is not an
Q157: Scenario 2.3
A job consists of three elements.
Q158: Scenario 2.5
A job consists of three distinct
Q159: A time study analyst is attempting to
Q160: Scenario 2.1
Garman observes a worker assembling peanut
Q162: A restaurant manager tracks complaints from the
Q163: A farmer that has been well-trained in
Q164: Table 2.15
An analyst notes the time that
Q165: A work sampling method is used to
Q166: Table 2.15
An analyst notes the time that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents