A well-educated operations manager used the capacity requirements equation to determine the number of crackerbox welders to purchase for the shop, given the standard time per unit, hours available per machine, among other relevant parameters. He studied the answer, 2.2, and concluded that:
A) he had made a mistake, since it isn't possible to purchase a fractional welder.
B) he needed to decrease his desired capacity cushion to bring him up to exactly three welders.
C) he should buy two welders and authorize 10% overtime to reach the 2.2 figure.
D) he should buy two welders and reduce the time per part by 10% to reduce the capacity need to two welders.
Correct Answer:
Verified
Q72: A well-educated operations manager used the capacity
Q73: The lock box department at Bank 21
Q74: A company's production facility, consisting of two
Q75: Innovative Inc. is experiencing a boom for
Q76: Table 4.1
The Union Manufacturing Company is producing
Q78: The time required to change a machine
Q79: George P. Burdell owns a hot tub
Q80: A standard work year is 2,000 hours
Q81: Scenario 4.6
Burdell Labs is a diagnostic laboratory
Q82: A process's _ is what its capacity
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents