Jones Electric Motors Uses a Kanban System to Make Motors

Question 135

Essay
Jones Electric Motors uses a Kanban system to make motors for several garage door companies in the southeastern United States. The daily demand for motor housings used in manufacturing is 100 units. The average waiting time for a container of parts is 0.2 day. The processing time for a container of housings is 0.1 day, and a container holds 5 housings. If Jones wishes to use a 10% policy variable, how many containers are needed?

Jones Electric Motors uses a Kanban system to make motors for several garage door companies in the southeastern United States. The daily demand for motor housings used in manufacturing is 100 units. The average waiting time for a container of parts is 0.2 day. The processing time for a container of housings is 0.1 day, and a container holds 5 housings. If Jones wishes to use a 10% policy variable, how many containers are needed?

Correct Answer:

verifed

Verified

k = blured image = blured image = ...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents