Small haphazard changes in a process variable due to alteration in the production environment that is not controllable are said to be assignable causes.
Correct Answer:
Verified
Q2: For a Q3: If a process is in control, we Q4: Once a process is in control and Q5: The mean of the sample means and Q6: The first objective in statistical process control Q7: If a process is in control, we Q8: Assignable cause variation refers to variation in Q9: Random cause variation refers to variation n, Q10: Fifty samples of size 500 were drawn Q11: Twenty five samples of size 1000 each