A manufacturing plant is trying to determine standard production per day for an incentive program. Suppose that the incentive program will pay $1 per unit produced above standard rates. A worker is timed at an average of 280 seconds per unit, with a performance rating of 105%. The plant has an allowance factor of 13%. If the worker later produces 100 units in an 8 hour shift, how much would he receive under the incentive plan?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q162: The objective of layout strategy is to:
A)
Q163: The _ layout's main objective is to
Q164: A hospital's layout most closely resembles which
Q165: Suppose that a time study analyst takes
Q166: Which of the following is NOT one
Q168: To obtain flexibility in layout, managers may
Q169: An initial analysis of a laboratory activity
Q170: A good layout requires determining:
A) material handling
Q171: An operation in a television factory has
Q172: Which of the following seeks the best
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents