Four hundred and eighty minutes of production time are available per day. The schedule calls for the production of 60 units per day. Each unit of the product requires 30 minutes of work. What is the theoretical minimum number of workstations?
A) 2
B) 3
C) 4
D) 5
E) 6
Correct Answer:
Verified
Q288: Cycle time is computed as:
A) desired output
Q289: Which of the following is TRUE regarding
Q290: In assembly-line balancing, the theoretical minimum number
Q291: Four hundred and eighty minutes of production
Q292: In assembly-line balancing, cycle time (the ratio
Q294: The central problem in product-oriented layout planning
Q295: The assumptions necessary for a successful product-oriented
Q296: Which of the following is NOT a
Q297: A production line is to be designed
Q298: A production line is to be designed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents