When using extrapolation to forecast,
A) a time series of past observations is used.
B) there is a large error term in the results.
C) predictions can only be made about the future.
D) dummy variables can skew the results.
Correct Answer:
Verified
Q75: What is the meaning of the statement
Q76: If we have a small standard error,
Q77: If two variables B and V are
Q78: The t-statistic measures
A)the efficiency of the t-test
Q79: If you are testing the null hypothesis,
Q80: A regression specification must include
A)the functional relationship
Q81: Forecasts based on an economic theory as
Q82: Smoothing a time series of observations
A)is a
Q83: Forecasts are
A)generally incorrect.
B)predictions about the future.
C)explanations of
Q84: Sometimes distinct patterns around a trend line
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents