All of the following are ways the WBS helps in managing projects EXCEPT
A) with cost and time estimates the WBS makes it possible to plan, schedule and budget the project.
B) it provides management with information appropriate to each level.
C) can be used to define communication channels.
D) allows the project manager to establish the overall objective of the project.
E) as it is developed, organizational units and individuals can be assigned responsibility of work packages.
Correct Answer:
Verified
Q38: A typical responsibility matrix will include not
Q39: The ability of a 911 emergency system
Q40: "To construct a high-quality, custom home within
Q41: All of the following are usually included
Q42: Which of the following is least likely
Q44: The integration of the lowest level of
Q45: The highest element in the hierarchical breakdown
Q46: The lowest element in the hierarchical breakdown
Q47: A Process Breakdown Structure can provide a
Q48: One way for a project manager to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents