Question 1
Multiple Choice
While the risks of construction lending may be less in a number of respects than those associated with land acquisition, banks still require a premium in their lending rate as compensation for the risks involved. For construction loans, banks typically require a premium above LIBOR that ranges from:
Question 2
Multiple Choice
Suppose that a developer pre-leases space to a financially strong, national tenant such as Home Depot, without having yet built the structure in which they will be leasing space. This is more commonly referred to as a:
Question 3
Multiple Choice
There are a number of ways that a developer can finance the establishment of site control, each with its own advantages and disadvantages. Which of the following methodologies calls for only the initial land rent to be paid out before development actually gets under way?
Question 4
Multiple Choice
With a site under control, the developer will begin to evaluate the feasibility of the project. The main tool that a developer will use in determining the financial feasibility of a project is:
Question 5
Multiple Choice
Since the architect can be involved in various stages of the development process, there are a number of methods used to compensate him for his services, each of which may depend on the particular phase of development. If the architect provides pre-design services or schematics early in the development process, he will typically be compensated:
Question 6
Multiple Choice
The expertise of several types of engineers must be coordinated by the architect in bringing together the final structure design. Which of the following types of engineers is responsible for specifications to achieve safety and stability for a structure's foundation?
Question 7
Multiple Choice
In each stage of the development process, the developer faces risks that can have a profound impact on the success of the particular project. Which of the following risks is of primary concern after the construction phase has been completed?
Question 8
Multiple Choice
Once a specific use has been chosen for a site, the first stage in the development process, often considered the "entry ticket to development," is:
Question 9
Multiple Choice
With a multitude of players involved in the development process, it is important to understand where they participate within the various stages of development. Which of the following individuals is the least likely to be involved in the design stage of development?
Question 10
Multiple Choice
Development involves a complex organization of many moving parts. Which of the following choices is often viewed as the single greatest cause of project delays and cost overruns?
Question 11
Multiple Choice
A developer's selection of an architect is a vital step in the development process as the architect fulfills a number of important roles throughout the life of the project. As compensation for contributions in the design phase, the architect is often given a percentage of the construction cost. For moderately complex designs, the average compensation will be:
Question 12
Multiple Choice
When construction costs exceed the amount of the construction loan, a developer may seek to cover the gap using mezzanine financing. All of the following statements regarding mezzanine debt are true EXCEPT: