Which of the following is least likely to be a source of disruption that results in less than the desired output in a high-volume system?
A) equipment failures
B) material shortages
C) accidents
D) worker absences
E) demand variability
Correct Answer:
Verified
Q86: High-volume jobs that often follow the same
Q87: Eva, the owner of Eva's Second Time
Q88: Job X, which has a duration of
Q89: Which costs depend on the order in
Q90: The operations manager of a body and
Q92: The owner/operator of the local franchise of
Q93: The operations manager of a body and
Q94: The operations manager of a body and
Q95: Job X arrived at work center Q
Q96: The operations manager of a body and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents