Question 1
Multiple Choice
The NEC requirements for minimum burial depths are found in Table __________.
Question 2
Multiple Choice
When installing an overhead service, __________ feet of conductor should stick out of the weatherhead for the formation of a drip loop.
Question 3
True/False
When installing a service entrance cable to the bottom of a meter socket enclosure located on the side of a house, you must use a rain-tight connector like the one used to connect the cable to the threaded hub.
Question 4
Multiple Choice
When using service entrance cable for the run between the weatherhead and the meter socket, the cable must be supported within __________ of both the weatherhead and the meter socket.
Question 5
True/False
If a metal water pipe is used as a grounding electrode, a supplemental grounding electrode must be used only if the resistance to ground exceeds 25 ohms.
Question 6
Multiple Choice
According to the NEC, the working space in front of a service entrance panel in a residential wiring application must be at least 6.5 feet high, 30 inches wide, and extend at least __________ feet in front of the panel.
Question 7
Multiple Choice
The grounding electrode conductor must be attached to a metal water pipe grounding electrode no more than __________ feet from the point where the metal water pipe enters the house.
Question 8
Multiple Choice
Where underground service conductors exit the trench to run up to a meter socket on the side of a house, __________ is not permitted to be used to provide the conductors with protection from physical damage.