All of the following are positive results from early supplier design involvement except _____.
A) longer lead-times in order to find and fix product defects before they get to the customer
B) better quality and product design
C) establishing reasonable tolerances
D) suppliers can anticipate and begin preproduction work
E) better product quality and manufacturability
Correct Answer:
Verified
Q36: ISO 9001 follows a product-based approach to
Q37: Designed-in systemic variation is a managerial concern,
Q38: Once a firm fully rationalizes and optimizes
Q39: It can take only a few months
Q40: Reliance on a firm's suppliers for raw
Q42: An emphasis on finished product rather than
Q43: Which of the following is not one
Q44: Inconsistency is the enemy of total quality.
Q45: _ are incurred following production or after
Q46: _ is the organized and systematic study
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents