Contractors are usually advised in the "____" to satisfy themselves as to the present condition of the site.
A) Notice to Bidders
B) Notice to Contractors
C) Instructions to Bidders
D) Instructions to Contractors
Correct Answer:
Verified
Q5: The soil that is extracted from an
Q6: The difference between the volume of the
Q7: The purpose of the _ is to
Q8: In accordance with the general principle of
Q9: Bearing piles are measured in linear feet
Q11: Measuring sitework and excavation work is the
Q12: The difference between the volume of the
Q13: _ are electronic devices that enable the
Q14: The volume of excavation for pits or
Q15: Generally, the volume of backfill for a