The difference between the volume of the hole to be filled and the volume of fill material used to fill is referred to as the ____ factor.
A) swell
B) limiting
C) bank
D) compaction
Correct Answer:
Verified
Q7: The purpose of the _ is to
Q8: In accordance with the general principle of
Q9: Bearing piles are measured in linear feet
Q10: Contractors are usually advised in the "_"
Q11: Measuring sitework and excavation work is the
Q13: _ are electronic devices that enable the
Q14: The volume of excavation for pits or
Q15: Generally, the volume of backfill for a
Q16: Sheet piling is measured in _.
A)square feet
B)cubic
Q17: OSHA's Construction Safety and Health Regulation s