Because the concrete is detailed on the drawings, it makes sense to begin the takeoff by measuring the volume of concrete in an item.
Correct Answer:
Verified
Q10: Welded wire mesh shall be measured in
Q11: Expansion joints are measured in _, stating
Q12: Linear inserts such as waterstops are measured
Q13: Finishes are first classified in terms of
Q14: Because only the _ of formwork is
Q15: Deduct for openings in the concrete that
Q16: Preparing a quantity takeoff of concrete work
Q17: Saw cuts for concrete are measured in
Q18: Concrete shall be measured in _ net
Q20: Bulkhead forms are measured to the perimeter