When working on the high-voltage system, which of the following should be done?
A) Always place the high-voltage service plug where someone will not accidentally reinstall it.
B) Before servicing, use a voltmeter set on 400 VDC to determine if the high-voltage system voltage is at 0 volts.
C) Test the integrity of the insulating gloves prior to use.
D) All of these choices.
Correct Answer:
Verified
Q2: To test the integrity of the insulating
Q3: The dual-voltage system can use:
A) A dual-generator
Q6: The main advantage of the ISG system
Q7: All of the following are benefits of
Q8: All of the following statements concerning hybrid
Q9: The splitting of water into hydrogen and
Q13: Electric vehicles power the motor by:
A) A
Q14: In a hybrid system, the _ _
Q19: The high-voltage service plug:
A) Disconnects the inverter/converter
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents