The exact sizes of beams and other structural material are typically determined before the initial working drawings are prepared.
Correct Answer:
Verified
Q5: What term refers to freehand sketches used
Q6: Which type of lender often requires extra
Q7: Drawing fees are generally charged per hour,
Q8: Who usually completes the foundation drawing?
A) junior
Q9: Which stage of the design process comes
Q10: A single construction permit usually covers all
Q11: Most houses are designed for one specific
Q12: Basic materials will typically account for approximately
Q13: As a CAD technician, visiting construction sites
Q14: Who should you should always check in