Solved

You Have Been Selected to Do the Telecommunications Design on a New

Question 106

Multiple Choice

You have been selected to do the telecommunications design on a new, single story building. The architect requires the size and location of the telecommunications rooms so their building design can proceed. From the items listed below (all of which are required for the design) , which one is the logical starting point in order to provide the architect with a size and location for the room?


A) Determine where the entrance facility will be
B) Determine the number of , their locations, and telecommunications services needed
C) Determine the power, HVAC, electrical, and security requirements for the room
D) Determine future growth and other requirements
E) Determine the types of equipment to be installed in the room

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents