You are starting work on a new high school. The architect has provided you with a telecommunications room located between the kitchen cold store room and the automotive and welding shops. What should you do?
A) Work with the architect to find another location
B) Insist that the welding shop be placed as far from the telecommunications space as possible
C) File a complaint with the client
D) Provide shielded cable tray in the telecommunications room and in the outer halls
E) Request that shielding be placed around the compressors and the arc welding units
Correct Answer:
Verified
Q110: The recommended ratio of patch panels to
Q111: The recommended MINIMUM number of conduits connecting
Q112: A campus backbone design linking two buildings
Q113: When allocating termination space for CAT 6
Q114: One advantage of using preconnectorized jumpers and
Q116: You are working on the design of
Q117: In a telecommunications room (TR), the MINIMUM
Q118: You are placing two 423 mm (19
Q119: Which of the following types of conduit
Q120: "A single outlet utilizing a dedicated phase,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents