Surge currents due to lightning and other sources MUST be ________ before they penetrate the infrastructure.
A) Shorted
B) Maximized
C) Terminated
D) Equalized
Correct Answer:
Verified
Q123: A _ eliminates the need to remove
Q124: You are designing a firestop system for
Q125: In addition to voice and data services,
Q126: Cementitious materials are _ based materials.
A) Dry
Q127: An isolated ground receptacle may be identified
Q129: You have determined that the equipment room
Q130: A(n) _ system is considered a mechanical
Q131: In a telecommunication room (TR), the _
Q132: Which of the following is a nonmechanical
Q133: You are designing a cabling system for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents