Multiple Choice
If the usable floor space is unknown, then deduct ________ percent of the total area available to estimate the usable area.
Question 122
Multiple Choice
Most types of firestop putty have ________ properties.
Question 123
Multiple Choice
A ________ eliminates the need to remove or install materials.
Question 124
Multiple Choice
You are designing a firestop system for a boiler room that will have conduits coming from the service provider maintenance hole into the building. Which test rating will address the firestops ability to resist breakdown from water damage?
Question 125
Multiple Choice
In addition to voice and data services, an equipment room (ER) can be designed to include all of the following EXCEPT:
Question 126
Multiple Choice
Cementitious materials are ________ based materials.
Question 127
Multiple Choice
An isolated ground receptacle may be identified by:
Question 128
Multiple Choice
Surge currents due to lightning and other sources MUST be ________ before they penetrate the infrastructure.
Question 129
Multiple Choice
You have determined that the equipment room (ER) you are designing will be the minimum size of 15 sq m (160 sq ft) and is servicing 80 but architectural changes will add 175 , which will require you to add a horizontal cross-connect (HC) . What size should the equipment room (ER) be?
Question 130
Multiple Choice
A(n) ________ system is considered a mechanical firestop.
Question 131
Multiple Choice
In a telecommunication room (TR) , the ________ is the facility used to make cross connections from the backbone cable to the horizontal cable.
Question 132
Multiple Choice
Which of the following is a nonmechanical firestop system?
Question 133
Multiple Choice
You are designing a cabling system for a chemical plant. What type of device is needed to prevent the spread of fire along the cable other than the barrier penetrations?
Question 134
Multiple Choice
Firestop ________, in conjunction with steel wedging plates, go in a steel cable tray.
Question 135
Multiple Choice
You are designing a firestop system for a hospital with several floors that have isolation rooms. Air leakage control is important to ensure rooms are sealed and restrict the spread of disease. Which firestop test rating should you use to ensure air leakage compliance?
Question 136
Multiple Choice
A fire ________ is a contained area that is completely enclosed by fire resistant walls, floors, and ceilings.
Question 137
Multiple Choice
The F rating for a framed wall/stud wall is ________ hour(s) .
Question 138
Multiple Choice
A building can have multiple equipment rooms (ERs) for all of the following reasons EXCEPT:
Question 139
Multiple Choice
You are designing the cabling infrastructure for a lab office building that will frequently change tenants. The owner will be responsible for all of the infrastructure that feeds each floor to include the telecommunication rooms. Which firestop method will best suit the owners needs?
Question 140
Multiple Choice
What type of material does NOT support combustion even under accelerated conditions?
showing 121 - 140 of 340
Prev
Next
Prev
1
...
3
4
5
6
7
8
...
10
11
12
13
14
15
16
17
Next
Related Quizzes
Previous slide
Next slide
Access For Free