Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Certification
Study Set
Building Industry Consulting Service International (BICSI)
Exam 1: BICSI Registered Communications Distribution Designer - RCDD
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 281
Multiple Choice
BICSI recommends that any trench ________ or more deep must be shored to prevent cave in.
Question 282
Multiple Choice
When installing underground entrances, no more than ________ 90-degree bends should be included between pulling points.
Question 283
Multiple Choice
When selecting poles for aerial telecommunications facilities, which of the following is the class number for the strongest rated pole?
Question 284
Multiple Choice
When a building is not on the property line, the building owner should provide a MINIMUM of ________ conduits from a point inside the building, to the property line or easement for entrance facilities.
Question 285
Multiple Choice
The MAXIMUM span length for an aerial entrance, from the last pole to the building, must NOT exceed:
Question 286
Multiple Choice
The information technology system (ITS) designer should design conduits entering a building from ceiling height to terminate ________ below the finished ceiling.
Question 287
Multiple Choice
Buildings larger than ________ must contain a dedicated room for the termination of entrance facilities.
Question 288
Multiple Choice
You have the responsibility of designing a railroad track crossing for an outside plant OSP cable. There are three separate railroad tracks to be crossed. The measurement between the center of the two outer tracks is 16 m (52 ft) . Using the standard track width of 1435 mm (4 ft 8.5 in) , what is the length of the rigid steel conduit required to facilitate the crossing?
Question 289
Multiple Choice
You are placing an entrance cable between two buildings connected by a conduit 205.3 m (588 ft) in length. What would be the MAXIMUM length of unlisted OSP cable that could be used before you terminate the cable or transition it to a listed cable?
Question 290
Multiple Choice
Which one of the following is NOT an advantage of direct-buried cable?
Question 291
Multiple Choice
To reduce the chance of an accidental dig-up, plastic warning tape should be placed a MINIMUM of _________ below grade, but high enough above cables to allow detection before cables are damaged.
Question 292
Multiple Choice
Which of the following is NOT a type of intrusion detection system sensor?
Question 293
Multiple Choice
What is the MINIMUM number of outside building terminal pedestals required to serve a single story office, or office warehouse structure that has ten 18.3 m x 24 m (60 ft x 80 ft) units and the total building length is 183 m (600 ft) ?
Question 294
Multiple Choice
Which one of the following is NOT an advantage of underground conduit?
Question 295
Multiple Choice
What is the MINIMUM cover for underground conduit?
Question 296
Multiple Choice
You are designing a strobe visual notification system for a fire alarm system. You have a hallway that is 4.6 m (15 ft) wide and 100 m (328 ft) long. How many strobes should be placed in the hallway?
Question 297
Multiple Choice
What is the horizontal separation, in well tamped earth, required between power and direct buried telecommunications facilities sharing the same trench?
Question 298
Multiple Choice
All entrance conduits should be equipped with a plastic or nylon line with a MINIMUM test rating of _________ pulling tension.
Question 299
Multiple Choice
Aerial entrances to small buildings should be limited to ________ cable pair or less.
Question 300
Multiple Choice
The MOST common medium used to provide service to the access point (AP) is ________ cable.
showing 281 - 300 of 340
Prev
Next
Prev
1
...
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Next
Related Quizzes
Previous slide
Next slide
Access For Free