You have the responsibility of designing a railroad track crossing for an outside plant OSP cable. There are three separate railroad tracks to be crossed. The measurement between the center of the two outer tracks is 16 m (52 ft) . Using the standard track width of 1435 mm (4 ft 8.5 in) , what is the length of the rigid steel conduit required to facilitate the crossing?
A) 20 m (66 ft)
B) 25 m (82 ft)
C) 31 m (102 ft)
D) 35 m (115 ft)
E) 40 m (130 ft)
Correct Answer:
Verified
Q283: When selecting poles for aerial telecommunications facilities,
Q284: When a building is not on the
Q285: The MAXIMUM span length for an aerial
Q286: The information technology system (ITS) designer should
Q287: Buildings larger than _ must contain a
Q289: You are placing an entrance cable between
Q290: Which one of the following is NOT
Q291: To reduce the chance of an accidental
Q292: Which of the following is NOT a
Q293: What is the MINIMUM number of outside
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents