Solved

A Company with a DR Site Connected with a 2

Question 80

Multiple Choice

A company with a DR site connected with a 2 Gbps FC link has three RPAs at each site. They are experiencing High Load events, although the FC link is not fully utilized. What would be the best solution to get the FC link utilization up as high as possible while mitigating those events?


A) Use a Distributed Consistency Group
B) Add one RPA to the Primary site
C) Use the Consistency Group on both RPAs and add two RPAs to the secondary site
D) Add one RPA to the DR site

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents