Solved

A Company with a DR Site Connected with a 2

Question 61

Multiple Choice

A company with a DR site connected with a 2 Gbps FC link has three vRPAs at each site. They are experiencing High Load events, although the FC link is not fully utilized. What would be the best solution to get the FC link utilization up as high as possible while mitigating those events?


A) Replace the vRPAs with physical RPAs and start using a Distributed Consistency Group
B) Add two more vRPAs to the Primary site and divide the Consistency Group into four segments
C) Divide the Consistency Group into two segments and start using Distributed Consistency Groups
D) Add two RPAs to the Primary site as well as the secondary site

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents