Three jobs are running, all with a priority of 5. A new job with a priority of 6 needs to be run. What happens?
A) The job engine pauses a priority 5 job and runs the new job until completion, then restarts the paused job from the point at which it was interrupted.
B) The job engine runs the new job in parallel with the other jobs.
C) The job engine pauses a priority 5 job and runs the new job until completion, then restarts the paused job from the beginning.
D) The job engine queues the new job until one of the currently running jobs completes.
Correct Answer:
Verified
Q292: Three jobs of different exclusion sets with
Q293: While configuring Isilon SmartConnect, a customer determined
Q294: What is the minimum size and the
Q295: A hospital is considering using Isilon to
Q296: Which type of data is stored in
Q298: What is a benefit of using SSDs
Q299: A four node F800 Isilon cluster running
Q300: An architect is designing a solution for
Q301: A storage administrator is configuring SAN switches
Q302: ![]()
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents