Three jobs of different exclusion sets with a priority level of 5 are concurrently running on a cluster. A new job with a priority of 4 needs to be run. What does the Job Engine do?
A) Pauses a priority 5 job and runs the new job until completion, then restarts the paused job from the beginning
B) Pauses all priority 5 jobs and runs the new job until completion, then restarts the paused job
C) Queues the old job of the same exclusion set until the job with a higher priority completes
D) Runs the new job in parallel with the other running jobs
Correct Answer:
Verified
Q287: An architect is designing a new cluster.
Q288: A 6 × F800 node Isilon cluster
Q289: You meet with the IT Director of
Q290: A customer needs to be able to
Q291: A customer wishes to back up their
Q293: While configuring Isilon SmartConnect, a customer determined
Q294: What is the minimum size and the
Q295: A hospital is considering using Isilon to
Q296: Which type of data is stored in
Q297: Three jobs are running, all with a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents