A Dell EMC Avamar backup administrator has recently added 2000 desktop/laptop clients running daily scheduled backups to the backup environment. However, the administrator notices that more than 2000 additional backups are running each day. What is the cause of this issue?
A) Backups are not completing in the scheduled time and are automatically re-running after four hours
B) By default, each desktop/laptop client can perform on-demand backups
C) Each desktop/laptop client automatically generates two backup jobs
D) Backups are exceeding the soft limit and are automatically split into two sessions
Correct Answer:
Verified
Q56: An EMC Avamar customer is deploying a
Q57: What is the minimum amount of RAM
Q58: What is the minimum seek time required
Q59: Which utility is used to ensure that
Q60: Which node configuration is supported by EMC
Q62: Which factor impacts Dell EMC Avamar checkpoint
Q63: A storage administrator needs to roll back
Q64: In a Dell EMC Avamar server rack
Q65: What is the grace period allowed for
Q66: Which port does EMC Avamar use to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents