A storage administrator needs to roll back the Dell EMC Avamar server to a pervious checkpoint. When is a checkpoint considered reliable enough to be used for a system rollback?
A) After a passed HFS check
B) After a successful garbage collection
C) Immediately after replication
D) Immediately after completion
Correct Answer:
Verified
Q58: What is the minimum seek time required
Q59: Which utility is used to ensure that
Q60: Which node configuration is supported by EMC
Q61: A Dell EMC Avamar backup administrator has
Q62: Which factor impacts Dell EMC Avamar checkpoint
Q64: In a Dell EMC Avamar server rack
Q65: What is the grace period allowed for
Q66: Which port does EMC Avamar use to
Q67: A company is purchasing a Dell EMC
Q68: A company wants to modify the Dell
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents