Refer to the exhibit. A new Cisco Nexus 5548 Switch connects to a network. SAN switching is configured on the switch. The switch fc2/10 NP uplink is shown in the exhibit. Which action ensures that fc2/10 is in an up state?
A) Replace the SFP port module in fc2/10.
B) Configure the admin port type E on the upstream switch that connects the port.
C) Enable NPIV on the upstream switch that connects the port.
D) Configure the BB_credit buffers on the upstream switch that connects the port.
Correct Answer:
Verified
Q16: Q17: Q18: An engineer troubleshoots a packet flow from Unlock this Answer For Free Now! View this answer and more for free by performing one of the following actions Scan the QR code to install the App and get 2 free unlocks Unlock quizzes for free by uploading documents