Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Certification
Study Set
Huawei
Exam 11: HCIE-Storage
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 401
Multiple Choice
Which of the following is incorrect regarding the Sompana oracle backup configuration?
Question 402
Multiple Choice
Which of the following are correct regarding the Huawei Oceanstro 9000 V100R001C30 products for video monitoring services? (multiple choice)
Question 403
True/False
In Huawei OceanStor 9000, the client that processes the write request performs data fragmentation according to the protection level specified in the file, divides the data chip, writes the corresponding node on power-saving memory, and then calculates the parity of each node data pieces, and writes to each node's power-saving memory. After the node writes the power-save memory, the write operation is successful.
Question 404
True/False
A client has 1100GB of data, including a backup window of 3 hours. The customer network uses GE networking. In order to meet customer backup requirements, you can only choose LAN free backup networking.
Question 405
True/False
Scale out is a scale-out architecture that upgrades storage systems typically by increasing the number of nodes by expanding more controllers to meet user data growth demand. Huawei OceanStor V3 storage system supports the use of smart IP card to achieve IP scale out.
Question 406
Multiple Choice
In the disaster recovery solutions provided by Huawei in Hong Kong and China in three different centers, which of the following combinations are recommended for the selection of networking and replication technologies?
Question 407
Multiple Choice
At the beginning of the VTL6900 system input, you need to prepare the physical device. As shown in the figure, the VTL6900 is the cut-off point of a physical device node on the VTL console. On the physical equipment to prepare this step, which description is correct? (multiple choice)
Question 408
Multiple Choice
Which Huawei oceanstro V3 storage system prefetch strategy is correct?
Question 409
Multiple Choice
In OceanStoe VIS6600T delivery scenarios, multiple vendors are often protected. To avoid unpredictable compatibility issues during project implementation you need to collect compatibility information before the project is implemented. The compatibility information collected below is in accordance with the specifications. (multiple choice)
Question 410
Multiple Choice
In the OceanStor VIS6600T dual-redundant switch network environment, using OceanStor Toolkit inspection found that "multi-path state detection "does not pass the inspection report. It is found that there are two routes in the 4 paths of the VIS6600T device's 0 node to each LUN of the array. The path status is disabled. According to the analysis, the switch port connected to port 0 of port A0 of node 0 on node 0 of the VIS6600T is visible on the optical switch. The received optical power is much lower than the rated power of the optical module. What actions should be taken to fix this?
Question 411
Multiple Choice
According to the backup plan, the storage capacity required by site A is 3000GB and the storage capacity required by site B is 1500GB. The deduplication ratio is 3. Based on this, what is the back end capacity?
Question 412
True/False
VMware cluster high availability technology enables proxies and Vcenter servers on each physical virtualization host to perform proxy communications. Vcenter retry and arbitration can be used to determine if there is a failure of this host