Determining whether Challenger's launch should be delayed or not was treated as a management decision by Gerald Mason rather than as a proper engineering decision and has been identified as a major mistake leading to the Challenger disaster. All of the following are aspects of a proper engineering decision except:
A) Has the potential to violate the standards of an engineering code of ethics.
B) Affects the performance of the organization.
C) Requires technical expertise.
D) May significantly affect the health, safety, and welfare of others.
Correct Answer:
Verified
Q15: According to the NSPE code of ethics,
Q16: LeMessurier violated the third fundamental canon to
Q17: How do the ACM and NSPE codes
Q18: The direct technical cause of the Challenger
Q19: A Proper Engineering Decision (PED) is a
Q20: A Proper Management Decision (PMD) is a
Q22: When Gerald Mason told Boisjoly's supervisor Bob
Q23: Sociologist Diane Vaughn coined the term normalization
Q24: Which of the following is an example
Q25: Which aspect of the Challenger case is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents