In horizontal construction, we would expect the Design Professional team to usually be led by an Engineer
Correct Answer:
Verified
Q5: There are two main types of construction
A)
Q6: Although not written in the contract
A) everyone
Q7: For millennia
A) construction was almost all masonry
B)
Q8: Projects are usually done
A) with a single
Q9: Multi-prime Contracts
A) use more detailed contracts
B) require
Q11: Good Contracts spell out the duty for
Q12: The Design Professionals are always bound by
Q13: If at all possible, avoid remedies imposed
Q14: The Owner expects the project to be
Q15: There are three broad types of construction: