In the pre-cast reinforced concrete piles, the thickness of concrete covering the main bars should not be less than
A) 40 mm
B) 55 mm
C) 75 mm
D) 100 mm
Correct Answer:
Verified
Q4: The arrangement of bricks is similar to
Q5: The exterior angle or corner of a
Q6: A flexible material used for D.P.C. is
A)bitumen
Q7: The vertical distance between the springing line
Q8: The piles which do not support the
Q10: The width of jambs is
A)57 mm to
Q11: A screw pile consists of cast iron
Q12: The slump commonly adopted for concrete for
Q13: A steel pile which function more efficiently
Q14: When a veavy structure is to be