Before starting piling work, a complete knowledge of underground structures (such as sewers, water pipeline, gas mains etc.) is essential.
A) Agree
B) Disagree
C) none
D) all
Correct Answer:
Verified
Q1: Who should be allowed to go below
Q2: In case of cantilever beam, reinforcement must
Q3: Full width of road should be taken
Q4: Pile drivers should be kept near electricity
Q6: If work of piling is to be
Q7: Moving parts of all equipment should be
A)Removed
B)Provided
Q8: Heavy equipment, such as excavating machinery, trucks,
Q9: Excavated material should be kept nearby from
Q10: Whenever workmen have to excavate in trenches
Q11: Outputs of management control level is
A)Goals and