Excavated material should be kept nearby from the edge of the trench
A) Agree
B) Disagree
C) none
D) all
Correct Answer:
Verified
Q4: Pile drivers should be kept near electricity
Q5: Before starting piling work, a complete knowledge
Q6: If work of piling is to be
Q7: Moving parts of all equipment should be
A)Removed
B)Provided
Q8: Heavy equipment, such as excavating machinery, trucks,
Q10: Whenever workmen have to excavate in trenches
Q11: Outputs of management control level is
A)Goals and
Q12: Special one time reports are information system
Q13: Formal reports are information system used by
A)Head
Q14: Operational control is responsibility of
A)Head of department
B)Top
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents