A 1 cubic meter (m3) highway embankment will be constructed from soil compacted to a dry unit weight of 17.5 kN/m3. Soil will be trucked to the site from a borrow pit. The natural water content of the soil in the borrow pit is 5% and the bulk unit weight is 17 kN/m3. What is the volume of soil needed from the borrow pit?
A) 12.22 m3
B) 1.08 m3
C) 3.57 m3
D) 10.00 m3
Correct Answer:
Verified
Q2: What is the approximate volume (in cubic
Q3: At which of the following points on
Q4: Which of the following elements are typically
Q5: What is the total length of an
Q6: What is the bearing of a 175
Q7: What does 17.1678° equate to when described
Q8: Of the following, which is an important
Q9: For which of the following project site
Q10: What is the number 124.632612 when shown
Q11: Which of the following order of measurements
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents