Overall Equipment Effectiveness is a composite metric for first pass yield. If 100 units of product are processed and 97 are completed to the required specifications with 4 requiring rework, calculate the first pass yield.
A) The first pass yield is 100%.
B) The first pass yield is 96%.
C) The first pass yield is 97%.
D) The first pass yield is 93%.
Correct Answer:
Verified
Q25: Measurements should be analyzed to determine their
Q26: Reporting of measurements helps to speed improvements.
Q27: Visual feedback on key measures should be
Q28: Which of the following key lean measures
Q29: Rework measures are critical to operationally monitoring
Q31: Which of the following key lean measures
Q32: Takt time is a measure which calculates
Q33: Cycle time is a key lean measurement
Q34: Lead time is the total time required
Q35: Which of the following lean cost metrics
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents