Takt time is a measure which calculates the longest period of time that can be spent processing a unit of product while still meeting the level of demand. Which of these steps is NOT included in the calculation of Takt time?
A) Calculating cycle time against Takt time.
B) Calculation of the demand in days, weeks, or months.
C) Calculation of the total available time.
D) Calculation of the delivery time.
Correct Answer:
Verified
Q27: Visual feedback on key measures should be
Q28: Which of the following key lean measures
Q29: Rework measures are critical to operationally monitoring
Q30: Overall Equipment Effectiveness is a composite metric
Q31: Which of the following key lean measures
Q33: Cycle time is a key lean measurement
Q34: Lead time is the total time required
Q35: Which of the following lean cost metrics
Q36: A Six Sigma Greenbelt is calculating key
Q37: Queue times are important lean measures in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents