Which of the following would lead a project team to determine a process was out of control?
A) Zero single points are outside the upper control limits.
B) At the fourth point, when two out of three successive points are on the same side of the centerline and farther than 2 ? from it.
C) Six out of the last eight points plot on the same side of the center line.
D) A run of four in a row are on the same side of the centerline.
Correct Answer:
Verified
Q150: Which lean tool would a project team
Q151: A lean process initiative has a production
Q152: Which of the following would NOT be
Q153: The Analysis of Variance (ANOVA) is a
Q154: The Ishikawa diagram determines the causes which
Q155: The project charter helps develop the project
Q156: Which of the following choices would an
Q157: Which lean tool below is a 5
Q158: All of the following are situations in
Q160: Which of the following choices is NOT
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents