While preparing a detailed estimate
A) dimension should be measured correct to 0.01 m
B) area should be measured correct to 0.01 sqm
C) volume should be measured correct to 0.01 cum
D) all the above
Correct Answer:
Verified
Q9: The trap which is provided to disconnect
Q10: Due to change in price level, a
Q11: The cost of the earthwork in excavation
Q12: The expected out turn of 2.5 cm
Q13: Pick up the correct statement from the
Q15: The item of the brick structure measured
Q16: The most reliable estimate is
A)detailed estimate
B)preliminary estimate
C)plinth
Q17: According to ISI method of measurement, the
Q18: Anti-siphonage pipe is connected to
A)main soil pipe
B)bottom
Q19: Pick up the correct statement from the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents