Pick up the correct statement from the following:
A) bricks are paid per thousand
B) cement is paid per 50 kg bag
C) lime is paid per quintal
D) all the above
Correct Answer:
Verified
Q15: The item of the brick structure measured
Q16: The most reliable estimate is
A)detailed estimate
B)preliminary estimate
C)plinth
Q17: According to ISI method of measurement, the
Q18: Anti-siphonage pipe is connected to
A)main soil pipe
B)bottom
Q19: Pick up the correct statement from the
Q21: Pick up the correct statement from the
Q22: Pick up the correct statement in case
Q23: The concrete work for the following part
Q24: The expected out turn of 12 mm
Q25: The total length of a cranked bar