Multiple Choice
Brick walls are measured in sq. m if the thickness of the wall is
Question 2
Multiple Choice
The brick work is not measured in cu m in case of
Question 3
Multiple Choice
The following item of earth work is not measured separately.
Question 4
Multiple Choice
The measurement is not made in square meters in case of
Question 5
Multiple Choice
Pick up the incorrect statement from the following:
Question 6
Multiple Choice
The item of steel work which is measured in sq.m, is
Question 7
Multiple Choice
The damp proof course (D.P.C.) is measured in
Question 8
Multiple Choice
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
Question 9
Multiple Choice
According to ISI method of measurement, the order of the sequence is
Question 10
Multiple Choice
Carpet area does not include the area of
Question 11
Multiple Choice
The item of the brick structure measured in sq.m, is
Question 12
Multiple Choice
The 'centre line method' is specially adopted for estimating
Question 13
Multiple Choice
The order of Taking dimensions is
Question 14
Multiple Choice
Pick up the item of work not included in the plinth area estimate
Question 15
Multiple Choice
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
Question 16
Multiple Choice
In the mid-section formula
Question 17
Multiple Choice
The correct Prismoidal formula for volume is