Berlin Industries uses a kanban system to manage production of the R-15 subassembly. They have an hourly demand for 250 units and use containers that can hold 50 parts each. It takes 90 minutes to fill and move a container of parts to the right place on the R-15 line that is currently rated at a 20% safety factor.
-Calculate the maximum system inventory for this part.
A) 450 units
B) 400 units
C) 2,500 units
D) 5,000 units
E) 75 units
Correct Answer:
Verified
Q13: An integrated electronic-chip manufacturer has a demand
Q14: An integrated electronic-chip manufacturer has a demand
Q15: An integrated electronic-chip manufacturer has a demand
Q16: An integrated electronic-chip manufacturer has a demand
Q17: Berlin Industries uses a kanban system to
Q19: Berlin Industries uses a kanban system to
Q20: Berlin Industries uses a kanban system to
Q21: Copenhagen Industries uses a kanban system to
Q22: Copenhagen Industries uses a kanban system to
Q23: Copenhagen Industries uses a kanban system to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents