An integrated electronic-chip manufacturer has a demand for a specific component of 800 parts per 8-hour day. The manufacturer wants to design a lean system using containers. The containers the manufacturer used for this component held 20 parts. It takes about 4 hours to round-trip a container from one work center to the next and back again. The manufacturer also wants to hold 10% of safety stock of this part in its system.
-Based on the required safety stock of zero and the number of containers computed in Question 13, what would be the new required round-trip time, all else being constant?
A) 4.4 hours
B) 4 hours
C) 3.5 hours
D) 5 hours
E) Need additional information to compute the value
Correct Answer:
Verified
Q10: A lean system uses 12 containers, each
Q11: An integrated electronic-chip manufacturer has a demand
Q12: An integrated electronic-chip manufacturer has a demand
Q13: An integrated electronic-chip manufacturer has a demand
Q14: An integrated electronic-chip manufacturer has a demand
Q16: An integrated electronic-chip manufacturer has a demand
Q17: Berlin Industries uses a kanban system to
Q18: Berlin Industries uses a kanban system to
Q19: Berlin Industries uses a kanban system to
Q20: Berlin Industries uses a kanban system to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents