Copenhagen Industries uses a kanban system to manage production of their subassembly. In a 10-hour day, they use 1,500 units and use containers that can hold 50 units each. It takes 45 minutes to fill and move a container of parts to the right place on the subassembly line that is currently rated at a 15% safety factor.
-If the required round-trip time is changed to 1 hour, how many containers should the lean system be using, all else being constant?
A) 15
B) 20
C) 10
D) 9
E) 5
Correct Answer:
Verified
Q20: Berlin Industries uses a kanban system to
Q21: Copenhagen Industries uses a kanban system to
Q22: Copenhagen Industries uses a kanban system to
Q23: Copenhagen Industries uses a kanban system to
Q24: Copenhagen Industries uses a kanban system to
Q26: Istanbul Industries uses a kanban system to
Q27: Istanbul Industries uses a kanban system to
Q28: Istanbul Industries uses a kanban system to
Q29: Istanbul Industries uses a kanban system to
Q30: Istanbul Industries uses a kanban system to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents