Lady Bug Machineries uses a lean production assembly line to make its generators. In one assembly area, the demand is 200 parts per 8-hour day. It uses a container that holds 10 parts. It typically takes about 5 hours to round-trip a container from one work center to the next and back again. They also desire to hold a 20% safety stock of this part in the system.
-Calculate the maximum system inventory for this part.
A) 250 units
B) 50 units
C) 100 units
D) 200 units
E) 150 units
Correct Answer:
Verified
Q27: Istanbul Industries uses a kanban system to
Q28: Istanbul Industries uses a kanban system to
Q29: Istanbul Industries uses a kanban system to
Q30: Istanbul Industries uses a kanban system to
Q31: Lady Bug Machineries uses a lean production
Q33: Lady Bug Machineries uses a lean production
Q34: Lady Bug Machineries uses a lean production
Q35: Lady Bug Machineries uses a lean production
Q36: Lady Bug Machineries uses a lean production
Q37: Lady Bug Machineries uses a lean production
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents