A producer of electronic components uses tote bins that hold exactly 25 parts. Weekly demand for the item is 600 units. Assuming a 40 hour week, a lead time of 4 hours, and a 10% safety stock, determine the number of tote bins required.
A) 24
B) 15.32
C) 16.5
D) 2.64
Correct Answer:
Verified
Q28: Facility-focused techniques
A) Enable workers to contribute in
Q29: Small scale equipment eliminates waste by
A) Forcing
Q30: A high-volume producer of custom-printed T-shirts needs
Q31: Compute the takt time for 950 units
Q32: Determine the appropriate number of kanbans for
Q34: A producer of molded plastic cases for
Q35: A manufacturer of custom paint and finishing
Q36: The primary objective of lean systems is
Q37: The seven categories of waste have substantial
Q38: Kanban utilizes _ _ of inventory between
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents