A producer of molded plastic cases for a variety of MP3 players and PDAs needs to fulfill and order for 20500 units. There are currently 214 hours available, and 190 hours required for producing the order. The changeover time is .5 hours. Determine the minimum batch size if the producer is to use all extra capacity for changeovers.
A) 834.167
B) 428
C) 48
D) 95
Correct Answer:
Verified
Q29: Small scale equipment eliminates waste by
A) Forcing
Q30: A high-volume producer of custom-printed T-shirts needs
Q31: Compute the takt time for 950 units
Q32: Determine the appropriate number of kanbans for
Q33: A producer of electronic components uses tote
Q35: A manufacturer of custom paint and finishing
Q36: The primary objective of lean systems is
Q37: The seven categories of waste have substantial
Q38: Kanban utilizes _ _ of inventory between
Q39: In order to produce in small batches,
Unlock this Answer For Free Now!